Romich Foundation Makerspace
An 8,125 SF community building that runs on solar and uses no concrete. I'm with the Foundation at every stage, from the first sketch through construction.
Follow it in the journal →I'm AJ Lammers, a licensed engineer who used to run a design-build company. Now I work for the owner. I handle the designers and the builders so the project doesn't eat your week.
The P.E. license covers the design. The experience runs the process. The MBA keeps every decision tied to your budget, today and for the life of the building.
Ohio P.E. · 20+ years in Northeast Ohio
Most owners don't need everything. Pick the stages you need and I'll hand off cleanly to whoever comes next. After move-in, I can keep your buildings on a plan.
Turn the idea into a floor plan and a budget range.
Permit-ready drawings, metal buildings included.
One licensed engineer signs and coordinates the set.
Real numbers and the right contractor.
I'm on site for you through the punch list.
Facility Capital Partner: a five-year plan for roofs, paving and HVAC.
Most owners start down one of these three roads. Each one works, and each one has a catch.
Your usual options
A big fee and a full commitment before anyone knows what it'll cost to build.
Fast, but you're locked in early, with less say in the look and the price.
You become the go-between, and the project turns into your second job.
With Lammers C&D
An 8,125 SF community building that runs on solar and uses no concrete. I'm with the Foundation at every stage, from the first sketch through construction.
Follow it in the journal →
A garage, a shop and a tiny-house guest apartment. A few concept layouts, then a permit set with the structural design.
I've led PEMB projects for manufacturing, logistics, airplane hangars and athletic facilities, from several thousand square feet to over 600,000. I've worked alongside owners from concept to occupancy.
A home addition, from a 3D model the owners could walk around to permit and structural drawings.
Pick your project size and how involved you want me to be. The calculator shows what's left in your pocket after my fee. In this example, every level saves more than it costs.
Estimates use industry averages. They aren't a quote.
The Makerspace Journal. One decision per post: what we weighed and what we picked.
I started as an engineer and spent 20 years in construction, the last stretch running a design-build contractor. Plants, hangars, barns, offices, and a lot of metal buildings.
I watched owners get stuck in the middle, refereeing between the architect and the contractor. So now I sit on the owner's side of the table.
The MBA means I also look at your building the way your CFO does: what it costs today, and what it'll cost in ten years.
Ohio P.E. · MBA, Bowling Green State · Insured (E&O and general liability)
Send a few details. I'll call you back myself, and we'll figure out which stages you actually need.